Articolo PDF (10,39 Mb)
Consultabile solo con Adobe Acrobat Reader (scopri come)

Sustainable reindustrialization of an existing plant for the prefabrication of the lining segments of the Florence high speed railway by-pass tunnels

2024 - Pàtron Editore

P. 31-42

24697 characters

Fa parte di

Gallerie e grandi opere sotterranee : XLVI, 152, 4, 2024