Article PDF (10.39 Mb)
Compatible only with Adobe Acrobat Reader (read more)

Sustainable reindustrialization of an existing plant for the prefabrication of the lining segments of the Florence high speed railway by-pass tunnels

2024 - Pàtron Editore

P. 31-42

24697 characters

Is part of

Gallerie e grandi opere sotterranee : XLVI, 152, 4, 2024